PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Installing rebar mats at Stair -4 (4th Floor) Facing East (800x600).jpg Installing the shear wall panels at Elev. 1,2,3 (4th Floor) Facing North  (800x600).jpg Pouring concrete at Elev. 4-Stair -2 (4th Floor) Facing North (800x600).jpg Underground piping conecting the Administration Bldg. (800x600).jpg Underground Roughing at the Men's Room 133 Facing North-East (800x600).jpg
Previous page Underground Roughing at the Men's Room 133 Facing North-East (800x600)
Underground Roughing at the Men's Room 133 Facing North-East (800x600)